Following up with the evaluation report, the corrections is executed.
Orders for the items and materials required is placed.
When everything is at one place, our experts will visit the propery and carry out the installation process.
Switch board sized cavities are created on the walls at specific locations to accomodate materials as required.
Discussions of very specific changes in lifestyle are recommended to the client and the residents of the Vaastu.
One Discussion is scheduled in 90 days to get feedback and observations from the client.
Note:
- The materials and items required for Vaastu corrections are to be ordered by the client, as it maintains transparency of business
- A consulting fee would be charged to the client along with the labor charges of the construction worker.
- The Vaastu Corrections take time to show effect. A range of 3 to 6 month period would be ideal to see noticable differences taking place in the lives of the owner.
As per Evaluation
>3 Visits + 1 Consultation
Razorpay charges a small platform fee for online payment aggregation..
If you have any questions, whatsapp us your queries at +91 91374 01186